ElectronicsEgypt
12V DC Brushless Fan 5x5 cm with Long Leads

12V DC Brushless Fan 5x5 cm with Long Leads

Lowest price now

45 EGP

1 offer · 1 stores

View in store: RAM Electronics

Prices updated: 13 Oct 2026

Compare prices

StorePriceView in store
RAM Electronics logoRAM Electronics45 EGPView in store

Price history

Lowest daily price, last 90 days

45.684544.3312 Oct 202613 Oct 2026

Lowest price recorded: 45 EGP

About this product

A 5 x 5 cm brushless DC cooling fan rated for 12 V and supplied with long connecting wires. It is useful for airflow in electronics enclosures, driver boards and DIY electronics projects.

Specifications

Fan type
DC brushless
Rated voltage
12 VDC
Size
5 x 5 cm
Leads
Long connecting wire

Frequently asked questions

What is the price of 12V DC Brushless Fan 5x5 cm with Long Leads in Egypt?

12V DC Brushless Fan 5x5 cm with Long Leads currently costs 45 EGP in Egypt.

Where can I buy 12V DC Brushless Fan 5x5 cm with Long Leads in Egypt?

12V DC Brushless Fan 5x5 cm with Long Leads is available from RAM Electronics. Compare the offers above to find the best price.

How do I wire this fan?

Connect the positive lead to 12V and the negative lead to GND. Red is usually positive and black negative, but confirm with the wire markings because some fans include a third tachometer wire.

Can I run this fan from a 5V supply?

The fan is rated for 12 V. Running it at a lower voltage reduces its speed and it may not start reliably, so use a 12 V supply for correct operation.